Shanxi Branch / Shanxi Branch

Shandong Shenghe Power Engineering Design Co., Ltd. Shanxi Branch was established on December 1, 2019. The office is located on the 15th floor of the west area of Qilian Building, No. 200 South Zhonghuan Street, Xiaodian District, Taiyuan City, Shanxi Province.


Since its establishment, Shanxi Branch has carried out work based on new energy businesses such as photovoltaic power generation, gas power generation, and waste heat utilization. With the help of the head office, the following work has been completed:


1. Completed the project application report, safety facility design, construction drawing design, and completion drawing design of 40 sets of 600KW internal combustion engine industrial exhaust gas generator sets for " Inner Mongolia Jinglei Industrial Co., Ltd. Manganese-Silicon Closed Furnace Tail Gas Comprehensive Utilization Project ";
2. Completed the feasibility study report and construction drawing design of 10 internal combustion engine gas generating units in the " Huangling No. 1 Coal Mine No. 4 Wind Shaft Comprehensive Utilization and Power Generation Project ";
3. Completed the 700KW rooftop photovoltaic construction drawing design work of " Anhui Baijia Technology Plant Roof Photovoltaic Building Integration (BIPV) R&D Demonstration Project ";
4. Assisted the head office to complete the EPC general contracting work of " Tangshan Electric Power Training Center 300KW Photovoltaic Power Generation Training System Project ";
5. Assisted the head office to complete the design of 3.2MW rooftop photovoltaic construction drawings and as-built drawings of the " Comprehensive Energy Service Project of Tongrentang Health Pharmaceutical Daxing Production Base ";
6. Assisted the head office to complete the project application report, construction drawing design work of 20 sets of 600KW internal combustion engine industrial exhaust gas generating units for " 12MW Submerged Arc Furnace Gas Power Generation Project of Inner Mongolia Xinchuang Metallurgical Co., Ltd. ";
7. Assisted the head office to complete the construction drawing design of " Tianjin Expressway Smart New Energy Comprehensive Development Photovoltaic Power Generation Project ".