Excellent Project / Excellent Project
Project Name: Qingdao Xinqianwan Container Terminal 0.76235 MW Distributed Photovoltaic Power Generation Project
Construction site: No. 567, Hanjiang Road, Bonded Port Area, Bonded Port Area
Project content: The design of the project, the approval of the access system, all procurement (excluding monocrystalline silicon components), engineering construction, including the survey, procurement, transportation and Storage, building installation, construction, commissioning, testing and inspection testing, trial operation, grid connection procedures, data uploading, elimination of deficiencies, training and final delivery and production, and quality assurance, etc.
Looking down on the automation terminal from the air, the reflected sunlight in the blue sky is particularly dazzling. The photovoltaic roof, photovoltaic quayside bridge, photovoltaic carport and the photovoltaic glass of the communication center platform with a total construction area of over 6,000 square meters are continuously generating electricity under the sunlight. There are abundant sunlight resources in the port area, and the annual effective sunlight time is up to 1260 hours. . The total installed capacity of various photovoltaic systems in the automated terminal has reached 800kWp. Relying on abundant light resources, the annual power generation is expected to reach 840,000 kWh, reducing carbon dioxide emissions by more than 810 tons. The project will be expanded by at least 6,000 square meters in the future. While fully integrating the roof space efficiency, through the supporting use of photovoltaic carports and charging piles, it can support green travel from multiple angles and realize the cross-border extension of green port construction.
Online Consultation
Related Suggestion
Online message
By clicking 'Allow All', you agree to the storage of cookies on your device to enhance site navigation, analyze site usage and assist with our marketing efforts. Coo Cookie Notice