Excellent Project / Excellent Project

Tiemenguan Zeyuan Thermal Power Co., Ltd. newly built 65th CFB boiler project

Project Name: New 65t/h Circulating Fluidized Bed Boiler Project (EPC) for Tiemenguan Zeyuan Thermal Power Co., Ltd.

Construction site: Tiemenguan Economic and Industrial Park.

Project scale: build a new 65t/h circulating fluidized bed boiler and its ancillary facilities.

EPC (engineering design, equipment and material procurement, construction, environmental protection engineering, installation, commissioning, post-completion test and 72-hour device performance assessment, etc.) project general contracting. Construction of a 65 t/h low temperature and low pressure circulating fluidized bed boiler and supporting auxiliary facilities, including project management, construction drawing design, procurement, construction, stand-alone commissioning, 72-hour + 24-hour linkage commissioning, Trial operation, defect rectification, performance test and assessment, special equipment forensics, relevant special acceptance and overall completion acceptance, quality assurance during the warranty period, and on-site operation training for production employees on the main equipment ordered by the contractor, assisting the developer to complete the production and operation personnel. Organizing training and production and operation guidance for 6 months, etc.




Online Consultation

Online message

Related Suggestion